Requirement :
|
Construction Of 2700 M Long Inlet Twin Barrel Sizing 3M X 3M Each In Submerged Area Of Gandhisagar Dam From Rl 383.50 M. And To Join It With Already Constructed Jackwell At Rl 382.57M Including Work Of Construction Of Coffer Dam, Dewatering, Excavation/Wet Excavation Including Shoring, Scaffolding, Formwork And All Other Necessary Protection Works, Construction Of Intake Structure And Trash Rake Including Construction Of Chamber At Rl 388 M. Or Location Decided By Department To Avoid Silting In The Barrel With Necessary Planning
|