Requirement :
|
Earthwork in bank / cutting for formation ( including side drains & trolley refuges)for new BG Chord line and on/adjoining the existing BG line formation including Level X-ings, yards, bridge approaches, platforms etc. , construction of major/minor ridges/RUBs/LHSs as per Railway approved drawings and Supplying and stacking of 50 mm gauge machine crushed stone ballast along the cess between Laxmibai Nagar (including ard)(Km75.79) - Dewas (including
yard)(KM 40@46'41@ in connection with Doubling between Ujjain-Indore via Dewas section of Western Railway
|