|
Requirement :
|
The Contractor shall provide all labor, materials, equipment, supervision, transport, and incidentals to complete the rehabilitation, new construction, and solarization of the TVET School in Sennar. This includes mobilization and demobilization of equipment, site preparation, rehabilitation of existing workshops, classrooms, toilets, and other facilities, construction of new toilets, installation of a solar energy system, and site protection and fencing. The objective is to comprehensively rehabilitate, upgrade, and equip the school to provide a safe, functional environment for technical education. steel doors, steel windows, ceiling fans, fluorescent lights, blackboards, iron skylights, aluminum partitions, distribution boards, washbasins, PPR pipelines, water tanks (2000L), water pumps (1 HP Pedrollo), water coolers, reinforced concrete septic tank, traditional handdug well, masonry walls, ceramic floor and wall tiles, exhaust fans, PVC sewage line, PPR fresh water line, 2000L water tank, LiFePO4 battery, solar PV system, inverters, mounting structures, DC combiner boxes, SPDs, AC distribution board, earthing system
|