|
Tender description :
|
PRN 086-26: Construction of Welcome Arc
Project Site: Brgy. Tuding, Itogon, Benguet Project Billboard/Signboard; Occupational Safety and Health program; Traffic Management; Erection and Dismantling of Scaffolding System; Cold Fast Marble Finish, Relief Sculpture, Logos, and Letterings; Decorative Metalwork; Painting Works Metal primer painting; Removal of Structures and Obstruction; Structure Excavation Common Soil; Embankment from Structure Excavation; Gravel Bedding; Structural Concrete for Footing and Slab on Fill Class A, 28days; Structural Concrete for Column and Beam Class A, 28 days; Reinforcing Steel of Reinforced Concrete Structures; Formworks and Falseworks; Unglazed Tiles; Cement Plaster Finish; Decorative Stone; Painting WorksConcrete Painting; 100 MM CHB including Reinforcing Steel; Structural Steel; Metal Structure Accessories Anchor Bolts; Metal Structure Accessories Steel Plates; Lighting Fixtures; Equipment Requirement: Workmen AheadT1-5; Traffic Cones; 3.0mx 1 ½” dia G.I. pipe S20; 1.5mx 1 ½” dia. G.I. pipe S20; Swivel Clamp; minor tools; Welding Machine 500A, Electric Driven/DC Output; Cutting Outfit; Backhoe 0.80 cu.m./1.04cu.yd.; Plate Compactor 5hp;One Bagger Mixer 4-6cu.ft./min; Concrete Vibrator; bar cutter; bar bender; Boom Truck2-5mt; 147 c.d.
Pre-bid Conference:
Date: 09/09/2026
Time: 9:00 AM
Venue: Municipal Hall, Municipal Building, Poblacion, Itogon, Benguet
Approved Budget: 3,500,000.00
Closing Date: 23/09/2026
|