|
Requirement :
|
The Works comprise the comprehensive rehabilitation, upgrading, repair, replacement, construction, installation, testing, commissioning, and handover of selected buildings, utility systems, and external infrastructure within El-Jabalain Hospital. The objective of the project is to restore and improve the functionality, safety, infection prevention standards, environmental health conditions, utility services, and operational capacity of the hospital through integrated civil, architectural, plumbing, sanitary, electrical, mechanical, healthcare support, and external infrastructure interventions. The Contractor shall provide all labor, materials, equipment, tools, transportation, supervision, temporary works, testing equipment, consumables, permits, quality control measures, and all associated resources necessary for the complete execution and successful completion of the Works. galvanized zinc roofing sheets, PPR pipe networks, water storage tanks, booster pumps, medical waste incinerator, aluminum doors, steel doors, iron doors, lead-lined radiation protection doors, aluminum windows, ceramic floor tiles, porcelain floor tiles, sanitary fixtures, wash basins, water closets, shower units, bidets, HVAC systems, electrical systems
|