Tender description :
|
Tenders are invited for Design and execution of Târgu Neam? Ia?i Highway Ungheni 2 Târgu Frumos Letcani
The investment objective of the Târgu Neam?-Ia?i-Ungheni Highway aims to create a modern communication path to achieve the junction between section 2 of the Ditrau-Târgu Neam? Highway in the area of ??Mo?ca at km 0+000, developing on a corridor from the west. to the east to the connection with the bridge over Prut in Ungheni. The section 2 Târgu Frumos - Le?cani has as its beginning point KM 31+500 (where the connection with the 1 Târgu Neam? (Mo?ca) - Târgu Frumos) is made. Between km 31+500 - km 40+000 the route of the highway is carried out north of DN28 in the area of ??Razboieni, Valea Oilor and Bal?ati and intersects DC117 and DC116. At km 40+000, in the area of ??crossing the Hirtopeanu Movile, given the nature of the land and the risk of slip, a tunnel was proposed to be executed using the CUT & Cover method, to limit the fingerprint of the works and to ensure the continuity of an agricultural operating road. Between km 40+000 - km 47+000, the route of the highway intersects DC115. The highway continues on the north the town of Podu Iloaiei, and at KM 50+100 a simple trumpet trumpet knot that makes the highway connection with DN28 to the west by Podu Iloaiei. According to the town of Iloaiei Bridge, the route of the highway bypasses an accumulation dam, intersects DJ281 and DJ282D, and between km 53+500-54+340, the Gheraiesti-Ia?i gas network (FIR I, II); Gheraiesti-Le?cani DN 700 (designed pipe). In order to make a connection of the highway with the municipality of Ia?i, a road knot that facilitates access to the western part of Ia?i, making the connection with the national road DN28 and the vo28d, through a road by a road by a road of a road of a road to a road. bundle. The length of the lot 2 of the motorway is 28.60 km, the length of the connecting road with DN 28 (4 -lane road) is 7.677 km and the length of the connecting road with DN 28D (2 -lane road) is 5 , 23 km. Number of days to which clarifications can be requested before the deadline for submission of tenders is 25 days. The contracting authority will respond to clarifications on the 12th day before the deadline for submission of tenders. The contracting authority will only respond to the requests for clarifications addressed by the economic operators until the established deadline.
Estimated value excluding VAT:6 515 481 117,53RON
|