|
Tender description :
|
Tenders Are Invited for Development Work on Two (02) Watersheds Totaling 5489 Ha
the Government of the Republic of Burundi Has Received Funding From the African Development Bank Hereinafter Referred to as the Bank to Finance the Cost of the Integrated Development Project Burundi-rwanda (bridep) Component Burundi and Intends to Use Part of This Grant to Make Payments Under the Contract for the Works for the Development of Two (02) Watersheds Totaling 5489 Ha Adjacent to the Two Irrigated Perimeters (watershed of 1815 Ha Adjacent to the Irrigated Perimeter of Gifurwe and Watershed of 3674 Ha Adjacent to the Irrigated Perimeter of Bugoma); Including the Protection and Stabilization of the Riverbeds That Supply Them with Irrigation Water in Bujumbura Province Divided Into Two (02) Distinct Lots:
lot 01: Works for the Development of the Watershed of 1815 Ha Adjacent to the Irrigated Perimeter of Gifurwe (585 Ha) Including the Protection and Stabilization of the Riverbeds That Supply It with Irrigation Water.
lot 02: Works for the Development of the Watershed of 3674 Ha Adjacent to the Irrigated Perimeter of Bugoma (610 Ha) Including the Protection and Stabilization of the Riverbeds That Supply It with Irrigation Water.
Bids must be submitted to the address below no later than 10:00 a.m. local time on June 1, 2026. Electronic bids will not be accepted. Late bids will be rejected. Bids will be opened publicly in the presence of the Bidders' designated representatives and any other persons who choose to attend at the address below on 10:15 a.m. local time on June 1, 2026.
|