Requirement : 3 Call Re-tender for “amc of Various O&m Works Under Planned/emergency/breakdown at Various Substat (o&m) Dn., Bhandup for Fy 2026-27.” Fixing Mid Span Joint for Acsr Conductor, Pl_laying of 2cx2.5mm² Cable, Pl_laying of 7cx2.5mm² Cable, Amc of Bay Maint. 2026-27, Pl_erection of 145kv Pt, Pl_dismantling 7cx2.5mm² Cable, Pl_erection Columns&beams Wt Transport., Pl_dismantling 220kv Sus. Wt Wt Si, Pl_repl. Spacer on Stub Twin Bus, Pl_erection 220kv Susp. Wt W/o Si, Pl_termination 14cx2.5mm² Cable Both End, Pl_dismantling 220kv 2b Condr Span, Pl_dismantling 132kv 2b Condr Span, Pl_alignment 145/245kv Iso. Wt M/e Trial, Pl_stringing Single Conductor Span, Pl_p&f 33kv 3cx25-50mm² I/d Et Joint, Pl_dismantling 12-36kv Bpi, Pl_erection of 145kv Bpi on Prov. Ss, Pl_erection of 245kv Isolator W/o Ss, Pl_dismantling 14cx2.5mm² Cable, Fixing Bimetallic Plate, Pl_termination 7cx2.5mm² Cable Both End, Pl_repl. 220kv Twin Susp.insu. String, Mobilisation of Gang/skilled Workers, Dismantling 245kv Isolator, Pl_dismantling 132kv Sus. Wt Wt Si, Pl_repl. 132kv Stn Disc Insulator String, Pl_dismantling 33kv 1b Condr Span, Pl_repl. 22-220kv Twin Ten.insu.string, Pl_dismantling 100 to 132 Kv La, Pl_dismantling 145kv Bpi, Pl_laying 22kv 3cx120-400mm² Xlpe Cable, Pl_dismantling 145kv Pt, Pl_repl. Spacer on Main Twin Bus, Fixing Comp. 100x100 Palm to 0.4 Acsr, Pl_dismantling 132kv Pedstal Wt Wt Ss, Pl_termination 2cx2.5mm² Cable Both End, Pl_dismantling 132kv Pedstal Wt W/o Ss, Pl_repl. Single Terminal Clamp, Pl_laying of 1cx630mm² Cable, Pl_dismantling Dc Ltg in Acdc Room, Pl_laying of 19cx2.5mm² Cable, Pl_alignment 12-36kv Iso. Wt M/e Trial, Stacking of Materials By Manual, Pl_erection of 145kv Cb Wt Modif. Fdn, Pl_repl. Jumper Connect.-single Stub Bus, Pl_fixing Mb on Provided Frame, Earthing of Eqpt/ss Wt Allied (agency), Renovation of Earth Pit Wt Old Earthpipe, Pl_erection Dc Ltg, Pl_termination 33kv Cable-i/d Gis Panel, Pl_dismantling 4cx2.5mm² Cable, Pl_repl. Jumper Connect.-twin Stub Bus, Pl_termination 12cx2.5mm² Cable Both End, Pl_p&f 33kv 3cx400mm² Cable St Joint, Pl_erection of 12-36kv Pt, Pl_connecting Earthwire for 11-33kv Gp-g, Pl_dismantling Eqpt Suprt Str, Pl_erection 220kv Pedstal Wt W/o Si, Pl_repl. Jumper Connect. Eqpt for Single, Pl_erection 132kv Pedstal Wt W/o Si, Pl_dismantling 245kv Cb, Pl_dismantling 33kv 2b Condr Span, Pl_erection of 88-120kv La, Pl_dismantling 12-36kv Isolator, Pl_fixing 80x80mm Palm -0.2/0.4 Acsr, Pl_erection of 245kv Ct, Pl_erection Dcdb in Acdc Room, Pl_erection of 36kv Cb Wt Modif. Fdn, Pl_erection of 245kv Cb Wt Modif. Fdn, Pl_connecting Earthwire for 220kv Gp-g, Pl_dismantling 245kv Ct, Pl_laying 33kv 3cx120-400mm² Xlpe Cable, Pl_dismantling 1cx630mm² Cable, Pl_crimping of 132/220kv Repair Sleeves, Pl_p&f 22kv 3cx300-400mm² Cable St Joint, Fix&crimp Single T Connector to 0.4 Acsr, Fixing Mcb, Pl_dismantling 12-36kv Pt, Pl_connecting Earthwire for 132kv Gp-g, Pl_stringing of Earthwire on Gp Wt H/w, Pl_crimping of 11-33kv Repair Sleeves, Pl_erection 145kv Coupling Capacitor, Pl_erection of 36kv Ct, Pl_dismantling 220kv Sus. Wt W/o Si, Repl. 220kv Stn Insulator String, Pl_dismantling 10cx2.5mm² Cable, Pl_erection 220kv Susp. Wt Wt Si, Pl_fix&crimp Jumper Cone to 0.4 Acsr, Pl_dismantling 220kv Pedstal Wt Wt Ss, Pl_testing of Hipot-33kv I/d Gis Panel, Pl_repl. Jumper Connect.-twin Main Bus, Pl_erection Main Ac Ltg, Pl_fixing Hpsv Lightg Fixture on Lm Top, P&f Gasket, Nut Bolt for Piping & Valve, Testing of Hipot of 33kv Cable, Pl_dismantling 145kv Coupling Capacitor, Pl_laying of 4cx2.5mm² Cable, Pl_termination 10cx2.5mm² Cable Both End, Pl_dismantling 12-36kv Ct, Pl_dismantling 220kv Pedstal Wt W/o Ss, Pl_dismantling 132kv 1b Condr Span, Pl_erection of 245kv Bpi on Prov. Ss, Pl_dismantling Dcdb in Acdc Room, Pl_termination 19cx2.5mm² Cable Both End, Pl_dismantling 3.5cx120mm² Cable, Pl_dismantling 198kv La, Pl_dismantling 132kv Sus. Wt W/o Si, Pl_dismantling C&r Panel, Pl_erection 132kv Susp. Wt W/o Si, Pl_laying of 14cx2.5mm² Cable, Pl_laying of 5cx2.5mm² Cable, Pl_fixing Acdb at Lm Bottom, Pl_dismantling 245kv Bpi, Pl_crimping Twin Condr -mb Jump T Clamp, Pl_repl. Twin Terminal Clamp, Pl_termination 5cx2.5mm² Cable Both End, Pl_termination 1cx630mm² Cable Both End, Pl_p&f 33kv 3cx240-400mm² O/d Et Joint, Pl_removing of Earthwire From Gp Wt H/w, Pl_erection of 145kv Ct, Pl_erection 132kv Susp. Wt Wt Si, Pl_fixing Mb By Required Ms Frame, Pl_crimping Single Condr-mb Jump T-clamp, Pl_dismantling 2cx2.5mm² Cable, Renovation Earth Pit (new Earthing Set), Pl_dismantling Main Ac Ltg in Acdc Room, Pl_erection of 245kv Pt, Pl_erection 245kv Coupling Capacitor, Pl_dismantling 12-36kv Cb, Pl_repl. Jumper Connect.-single Main Bus, Pl_erection of 9-30kv La, Pl_termination 4cx2.5mm² Cable Both End, Pl_laying of 12cx2.5mm² Cable, Pl_erection Eqpt Suprt Str Wt Transport., Pl_erection 220kv Pedstal Wt Wt Si, Pl_dismantling 19cx2.5mm² Cable, Pl_erection 132kv Pedstal Wt Wt Si, Excavation Pit -earthstrip in Norm Soil, Pl_dismantling 145kv Ct, Pl_fixing Cable Trays on Eqpt. Ss, Pl_dismantling 220kv 1b Condr Span, Pl_dismantling 12cx2.5mm² Cable, Pl_erection C&r Panel/bcu Wt Allied Ser., Pl_dismantling 110-145kv Cb, Pl_laying of 10cx2.5mm² Cable, Pl_dismantling 5cx2.5mm² Cable, Pl_erection of 12-36kv Bpi on Prov. Ss, Pl_dismantling 9-30kv La, Pl_erection of 145kv Isolator W/o Ss, Pl_repl. Jumper Connect. Eqpt for Twin, P&termination of Cable Wt Gland & Lugs, Pl_dismantling Columns&beams Wt Transp., Hiring of Crane (hour), Pl_dismantling 245kv Pt, Pl_erection of Acdb in Acdb Room, Pl_erection of 36kv Isolator W/o Ss, Pl_erection of 198kv La, Dismantling 145kv Isolator, Pl_dismantling Main Acdb in Acdc Room, Pl_stringing Twin Conductor Span, Pl_dismantling 245kv Coupling Capacitor, P&f 80x80mm Ct Clamp for 0.4 Acsr, Pl_p&f 33kv 3cx300mm² Cable St Joint, Pl_p&f 22kv 3cx240-400mm² O/d Et Joint, Repl. 220kv Ssn Insulator String
Tender description : Fixing Mid Span Joint for Acsr Conductor,pl_laying of 2cx2.5mm² Cable,pl_laying of 7cx2.5mm² Cable,amc of Bay Maint. 2026-27,pl_erection of 145kv Pt,pl_dismantling 7cx2.5mm² Cable,pl_erection Columns&beams Wt Transport.,pl_dismantling 220kv Sus. Wt Wt Si,pl_repl. Spacer on Stub Twin Bus,pl_erection 220kv Susp. Wt W/o Si,pl_termination 14cx2.5mm² Cable Both End,pl_dismantling 220kv 2b Condr Span,pl_dismantling 132kv 2b Condr Span,pl_alignment 145/245kv Iso. Wt M/e Trial,pl_stringing Single Conductor Span,pl_p&f 33kv 3cx25-50mm² I/d Et Joint,pl_dismantling 12-36kv Bpi,pl_erection of 145kv Bpi on Prov. Ss,pl_erection of 245kv Isolator W/o Ss,pl_dismantling 14cx2.5mm² Cable,fixing Bimetallic Plate,pl_termination 7cx2.5mm² Cable Both End,pl_repl. 220kv Twin Susp.insu. String,mobilisation of Gang/skilled Workers,dismantling 245kv Isolator,pl_dismantling 132kv Sus. Wt Wt Si,pl_repl. 132kv Stn Disc Insulator String,pl_dismantling 33kv 1b Condr Span,pl_repl. 22-220kv Twin Ten.insu.string,pl_dismantling 100 to 132 Kv La,pl_dismantling 145kv Bpi,pl_laying 22kv 3cx120-400mm² Xlpe Cable,pl_dismantling 145kv Pt,pl_repl. Spacer on Main Twin Bus,fixing Comp. 100x100 Palm to 0.4 Acsr,pl_dismantling 132kv Pedstal Wt Wt Ss,pl_termination 2cx2.5mm² Cable Both End,pl_dismantling 132kv Pedstal Wt W/o Ss,pl_repl. Single Terminal Clamp,pl_laying of 1cx630mm² Cable,pl_dismantling Dc Ltg in Acdc Room,pl_laying of 19cx2.5mm² Cable,pl_alignment 12-36kv Iso. Wt M/e Trial,stacking of Materials By Manual,pl_erection of 145kv Cb Wt Modif. Fdn,pl_repl. Jumper Connect.-single Stub Bus,pl_fixing Mb on Provided Frame,earthing of Eqpt/ss Wt Allied (agency),renovation of Earth Pit Wt Old Earthpipe,pl_erection Dc Ltg,pl_termination 33kv Cable-i/d Gis Panel,pl_dismantling 4cx2.5mm² Cable,pl_repl. Jumper Connect.-twin Stub Bus,pl_termination 12cx2.5mm² Cable Both End,pl_p&f 33kv 3cx400mm² Cable St Joint,pl_erection of 12-36kv Pt,pl_connecting Earthwire for 11-33kv Gp-g,pl_dismantling Eqpt Suprt Str,pl_erection 220kv Pedstal Wt W/o Si,pl_repl. Jumper Connect. Eqpt for Single,pl_erection 132kv Pedstal Wt W/o Si,pl_dismantling 245kv Cb,pl_dismantling 33kv 2b Condr Span,pl_erection of 88-120kv La,pl_dismantling 12-36kv Isolator,pl_fixing 80x80mm Palm -0.2/0.4 Acsr,pl_erection of 245kv Ct,pl_erection Dcdb in Acdc Room,pl_erection of 36kv Cb Wt Modif. Fdn,pl_erection of 245kv Cb Wt Modif. Fdn,pl_connecting Earthwire for 220kv Gp-g,pl_dismantling 245kv Ct,pl_laying 33kv 3cx120-400mm² Xlpe Cable,pl_dismantling 1cx630mm² Cable,pl_crimping of 132/220kv Repair Sleeves,pl_p&f 22kv 3cx300-400mm² Cable St Joint,fix&crimp Single T Connector to 0.4 Acsr,fixing Mcb,pl_dismantling 12-36kv Pt,pl_connecting Earthwire for 132kv Gp-g,pl_stringing of Earthwire on Gp Wt H/w,pl_crimping of 11-33kv Repair Sleeves,pl_erection 145kv Coupling Capacitor,pl_erection of 36kv Ct,pl_dismantling 220kv Sus. Wt W/o Si,repl. 220kv Stn Insulator String,pl_dismantling 10cx2.5mm² Cable,pl_erection 220kv Susp. Wt Wt Si,pl_fix&crimp Jumper Cone to 0.4 Acsr,pl_dismantling 220kv Pedstal Wt Wt Ss,pl_testing of Hipot-33kv I/d Gis Panel,pl_repl. Jumper Connect.-twin Main Bus,pl_erection Main Ac Ltg,pl_fixing Hpsv Lightg Fixture on Lm Top,p&f Gasket,nut Bolt for Piping & Valve,testing of Hipot of 33kv Cable,pl_dismantling 145kv Coupling Capacitor,pl_laying of 4cx2.5mm² Cable,pl_termination 10cx2.5mm² Cable Both End,pl_dismantling 12-36kv Ct,pl_dismantling 220kv Pedstal Wt W/o Ss,pl_dismantling 132kv 1b Condr Span,pl_erection of 245kv Bpi on Prov. Ss,pl_dismantling Dcdb in Acdc Room,pl_termination 19cx2.5mm² Cable Both End,pl_dismantling 3.5cx120mm² Cable,pl_dismantling 198kv La,pl_dismantling 132kv Sus. Wt W/o Si,pl_dismantling C&r Panel,pl_erection 132kv Susp. Wt W/o Si,pl_laying of 14cx2.5mm² Cable,pl_laying of 5cx2.5mm² Cable,pl_fixing Acdb at Lm Bottom,pl_dismantling 245kv Bpi,pl_crimping Twin Condr -mb Jump T Clamp,pl_repl. Twin Terminal Clamp,pl_termination 5cx2.5mm² Cable Both End,pl_termination 1cx630mm² Cable Both End,pl_p&f 33kv 3cx240-400mm² O/d Et Joint,pl_removing of Earthwire From Gp Wt H/w,pl_erection of 145kv Ct,pl_erection 132kv Susp. Wt Wt Si,pl_fixing Mb By Required Ms Frame,pl_crimping Single Condr-mb Jump T-clamp,pl_dismantling 2cx2.5mm² Cable,renovation Earth Pit (new Earthing Set),pl_dismantling Main Ac Ltg in Acdc Room,pl_erection of 245kv Pt,pl_erection 245kv Coupling Capacitor,pl_dismantling 12-36kv Cb,pl_repl. Jumper Connect.-single Main Bus,pl_erection of 9-30kv La,pl_termination 4cx2.5mm² Cable Both End,pl_laying of 12cx2.5mm² Cable,pl_erection Eqpt Suprt Str Wt Transport.,pl_erection 220kv Pedstal Wt Wt Si,pl_dismantling 19cx2.5mm² Cable,pl_erection 132kv Pedstal Wt Wt Si,excavation Pit -earthstrip in Norm Soil,pl_dismantling 145kv Ct,pl_fixing Cable Trays on Eqpt. Ss,pl_dismantling 220kv 1b Condr Span,pl_dismantling 12cx2.5mm² Cable,pl_erection C&r Panel/bcu Wt Allied Ser.,pl_dismantling 110-145kv Cb,pl_laying of 10cx2.5mm² Cable,pl_dismantling 5cx2.5mm² Cable,pl_erection of 12-36kv Bpi on Prov. Ss,pl_dismantling 9-30kv La,pl_erection of 145kv Isolator W/o Ss,pl_repl. Jumper Connect. Eqpt for Twin,p&termination of Cable Wt Gland & Lugs,pl_dismantling Columns&beams Wt Transp.,hiring of Crane (hour),pl_dismantling 245kv Pt,pl_erection of Acdb in Acdb Room,pl_erection of 36kv Isolator W/o Ss,pl_erection of 198kv La,dismantling 145kv Isolator,pl_dismantling Main Acdb in Acdc Room,pl_stringing Twin Conductor Span,pl_dismantling 245kv Coupling Capacitor,p&f 80x80mm Ct Clamp for 0.4 Acsr,pl_p&f 33kv 3cx300mm² Cable St Joint,pl_p&f 22kv 3cx240-400mm² O/d Et Joint,repl. 220kv Ssn Insulator String
Company Industry: Power Plant

Key values

Document fees : INR 590
EMD : INR 25,000
Tender Estimated cost : INR 2,499,997
Closing date : 24/04/2026
Location : India-Maharashtra

Tender Documents

Top