|
Tender description :
|
CONSTRUCTION OF ACADEMIC BUILDING, MAIN CAMPUS
Quantity Unit Item Description CONSTRUCTION OF ACADEMIC BUILDING, MAIN CAMPUS 1.00 ea. Project Billboard / Signboard 1.00 l.s Occupational Safety and Health Program 1.00 l.s Permits and Clearances 1.00 l.s Mobilization / Demobilization 1.00 l.s. Removal of Structures and Obstruction 505.66 m³ Structure Excavation Common Soil 351.44 m³ Embankment 61.32 m³ Gravel Fill 501.95 m³ Structural Concrete Class A,28 days 70,031.75 kg Reinforced Steel of Reinforced Concrete Structure Gr.40 680.43 m² Formworks and Falseworks 589.67 m² 100mm CHB Nonload BearingIncluding Reinforcing Steel 799.39 m² 150mm CHB Nonload BearingIncluding Reinforcing Steel 16.80 m² Louver Blocks 50.00 liter Soil Poisoning 5,350.23 m² Plain Cement Plaster Finish 414.98 m² Glazed Tiles and Trims 69.50 m² Unglazed Glazed Tiles 12.42 m² Granite Tiles 54.67 m² Pebble Washout 1.00 l.s. Railing 351.53 m² Ceiling 4.5mm,Metal Frame,Fiber cement Board 177.20 m² Ceiling Metal Frame,PVC 6.75 m² Wall Metal Frame, PVC 432.00 m² Acoustical Celing Panel 1.00 l.s. Carpentry and Joinery Works 1.00 l.s Finishing Hardware 176.56 m² Aluminum Glass Window 7.92 m² Tempered Glass Door, 12mm, Reflective 4.80 m² Tempered Glass Wall/Barriers, etc. 12mm 22.00 set Frames Jambs, Sill, Head, Transoms and Mullions 2.94 m² Doors Flush 43.62 m² Doors Wooden Panel 8.04 m² Fire Rated Fire Exit Steel Door 1.00 l.s. Steel Doors and Frames 176.94 m² Aluminum Cladding 475.10 m Metal Deck Panel 375.33 m² Roofing panels, Ribtype Sandwich Panel 25mm 26.60 m² uPVC Roofing Panel, Thermoplastic Skylight 520.56 m² Prepainted Metal Sheets, above 0.427mm Ribtype, Longspan 143.10 m Fabricated Metal Roofing Accessory 17,402.67 kg Structural Steel Trusses 5,199.84 kg Structural Steel Purlins 96.00 ea. Metal Structure Accessories, Bolts 36.00 ea. Metal Structure Accessories, Turnbuckle 72.00 ea. Metal Structure Accessories, Crossbracing 217.04 kgs Metal Structure Accessories, Steel Plates 384.00 ea. Metal Structure Accessories, Sagrods 1.00 l.s. Metal Structure Accessories 4,698.13 m² Painting Works, Masonry/Concrete 93.12 m² Painting Works, Wood 1,122.37 m² Painting Works, Steel 1.00 l.s Sewer Line Works 1.00 l.s Cold waterline Works 1.00 l.s Plumbing Works 11.00 ea. Catch Basin, CHB 1.00 l.s Septic Vault, Concrete/CHB 1.00 l.s Wires and Wiring Devices 1.00 l.s Lightning Fixtures and Lamps 1.00 l.s Conduit, Boxes and Fittings 1.00 l.s Panel Board with Main and Branch Breakers 1.00 l.s Pole Mounted Power Transformer OISC 1.00 l.s Network Cabling System 14.00 set Fire Extinguisher 1.00 set Fire Department connections for dry type system 1.00 l.s. Airconditioning System, Package/Split type *** Nothing Follows ***
Pre-bid Conference:
Date: 27/04/2026
Time: 10:30 AM
Venue: OOS CONFERENCE ROOM, ADMIN BUILDING, PMMA COMPLEX, NATIVIDAD, SAN NARCISO, ZAMBALES and/or through video conferencing via MS TEAM with this link:https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZDRiN2EwMDQtODY0Yy00MGNiLTk2NWUtOWVhZTIwZWNiOTE3%40thre
Approved Budget: 37,999,877.33
Closing Date: 11/05/2026
|