Requirement : Completion of Public Toilet and Multi-Purpose Bldg./Sport Facility - Poblacion, Malay, Aklan
Tender description : Completion of Public Toilet and Multi-Purpose Bldg./Sport Facility - Poblacion, Malay, Aklan 1 General Requirements 1.1 B2 / Project Signages 2.00 each 2 Ground Preparation 120.00 m2 3 Reinforced Concrete 3.1 Foundation 3.20 m3 3.2 WF and GTB / PB 4.80 m3 3.3 Column 7.65 m3 3.4 RCB 8.80 m3 3.5 RCS 18.70 m3 3.6 RC Wall 30.00 m3 4 Forms and Scaffoldings 313.60 m2 5 Welded Structural Steel 844.62 m2 6 Roofing Works 844.62 m2 7 Painting Works 508.28 m2 8 Installation of Doors and Windows 1.00 lot 9 Plumbing Works 1.00 lot 10 Electrical Works 1.00 lot 11 Tile Works 121.00 m2 12 Carpentry Works 40.00 m2 TOTAL PROJECT COST Republic of the Philippines Province of Aklan Municipality of Malay Project: Completion of Public Toilet and Multi-Purpose Bldg./ Sports Facility Location: Poblacion, Malay, Aklan Fund: General Fund ITEM DESCRIPTION QTY. UNIT UNIT COST AMOUNT 1 General Requirements 1.1 B2 / Project Billboard / COA Billboard 2.00 each Labor 2 – Unskilled Laborer 1.00 day Materials Signage 2.00 each 2 Ground Preparation 120.00 m2 Structural Excavation 72.00m300 Structural Backfill 52.88m3 Embankment 60.81m3 Labor 1 – Construction Foreman 6.00 days 2 – Mason / Carpenter 6.00 days 8 – Skilled Laborer 6.00 days Materials 2” x 3” x 12’ C/L 20.00 pcs 4” CWN 5.00 kgs 3” CWN 5.00 kgs 2 – ½” CWN 5.00 kgs 1 – ½” CWN 3.00 kgs 3 Reinforced Concrete 3.1 Foundation 3.20 m3 Labor 1 – Construction Foreman 3.00 days 2 – Mason 3.00 days 2 – Steelman 3.00 days 4 – Skilled Laborer 3.00 days Materials Portland Cement 39.00 bags 1” Graded Gravel 4.00 cu.m. Washed Sand 3.00 cu.m. 16mmØ x 6m RSB 14.00 length 16 GI Wire 2.00 kgs 3.2 WF and GTB/PB 4.80 m3 Labor 1 – Construction Foreman 6.00 days 2 – Mason 6.00 days 2 – Steelman 6.00 days 6 – Skilled Laborer 6.00 days Materials Portland Cement 58.00 bags 1” Graded Gravel 5.00 cu.m. Washed Sand 4.00 cu.m. 16mmØ x 6m RSB 75.00 length 10mmØ x 6m RSB 90.00 length 16 GI Wire 19.00 kgs 3.3 Column 7.65 m3 Labor 1 – Construction Foreman 6.00 days 2 – Mason 6.00 days 2 – Steelman 6.00 days 6 – Skilled Laborer 6.00 days Materials Portland Cement 69.00 bags 1” Graded Gravel 9.00 cu.m. Washed Sand 6.00 cu.m. 16mmØ x 6m RSB 100.00 length 10mmØ x 6m RSB 62.00 length 16 GI Wire 20.00 kgs 3.4 RCB 8.80 m3 Labor 1 – Construction Foreman 6.00 days 3 – Mason 6.00 days 3 – Steelman 6.00 days 4 – Skilled Laborer 6.00 days Materials Portland Cement 80.00 bags 1” Graded Gravel 10.00 cu.m. Washed Sand 7.00 cu.m. 16mmØ x 6m RSB 159.00 length 10mmØ x 6m RSB 129.00 length 16 GI Wire 50.00 kgs 3.5 RCS 18.70 m3 Labor 1 – Construction Foreman 12.00 days 4 – Mason 12.00 days 4 – Steelman 12.00 days 6 – Skilled Laborer 12.00 days Materials Portland Cement 169.00 bags 1” Graded Gravel 19.00 cu.m. Washed Sand 13.00 cu.m. 10mmØ RSB x 6m 680.00 length 16 GI Wire 70.00 kgs 3.6 RC Wall 30.00 m3 Labor 1 – Construction Foreman 12.00 days 4 – Mason 12.00 days 4 – Steelman 12.00 days 8 – Skilled Laborer 12.00 days Materials Portland Cement 270.00 bags 1” Graded Gravel 30.00 cu.m. Washed Sand 21.00 cu.m. 10mmØ RSB x 6m 800.00 length 16 GI Wire 66.00 kgs 4 Forms and Scaffolding 313.60 m2 Column 43.20m2 Roof Beam 70.40m2 Floor Slab 40.00m2 Scaffolding 160.00m2 Labor 1 – Construction Foreman 24.00 days 6 – Carpenter 24.00 days 6 – Skilled Laborer 24.00 days Materials 2” x 3” x 12’ C/L 1000.00 pcs Bamboo Poles 500.00 length 3/8” x 4’ x 8’ thk Phenolic 80.00 sheets 4” CWN 30.00 kgs 3” CWN 30.00 kgs 2 – ½” CWN 30.00 kgs 1 – ½” CWN 20.00 kgs 5 Welded Structural Steel 844.62 m2 Truss 844.62 m2 Area for Sliding 0.36 m2 Number of Trusses 8.00 truss Number of Grit 2.00 grit Purlins 1,020.00 lm Fascia 100.00 lm Labor 4 – Welder 24.00 days 4 – Skilled Laborer 24.00 days Equipment 2 - Welding Machine 10.00 days 4 - Electric Grinder 10.00 days Materials 2” Diameter x 6m G.I. Pipe, S40 72.00 length 1-1/2” Diameter x 6m G.I. Pipe, S40 62.00 length 1-1/4” Diameter x 6m G.I. Pipe, S40 50.00 length 16mm dia Tension Rod w/ Turnbuckle 50.00 pcs 3/16” x 1” Angle Bar 50.00 pcs ¼” x 1-1/2” Angle Bar 4.00 length 2 x 4 x 1.20mm 18 C-Purlins 100.00 length 12mmØ plain round bar 25.00 length Grinder Stone 15.00 pcs E6013 Welding Rod 50.00 kgs 6 Roofing Works 844.62 m2 Area 844.62m2 Fascia and Gutter 50.00 lm Labor 2 – Tinsmith 15.00 days 6 – Skilled Laborer 15.00 days Equipment 3 – Electric Drill 15.00 days Materials 0.4mm thk. X 1.090m x 12.0m Long Span Rib Type Pre-Painted Baguio Green 20.00 sheet 0.40mm x 8’ GI End Flashing 50.00 pcs ½ x 12 x 8 Ficem Facia Board 50.00 pcs 2-1/2 Tekscrew with neoprene washer 7,875.00 pcs Elastomeric Sealant 1 liter 10.00 cans 7 Painting Works 508.00 m2 Area 508.28m2 Roofings 425.78 - 2 coats using roller and 1 coat using neutralizer Truss 24.82 - 2 coats using roller and 1 coat using neutralizer Grit 419.52 - 2 coats using roller and 1 coat using neutralizer Labor 4 – Painter 24.00 days Materials Skimcoat heavy duty 60.00 bags Semigloss Latex White 40.00 gal Sun and Rain Elastomeric Paint Colored 40.00 gal Metal Primer 10.00 gal Rust Converter 5.00 gal Paint Thinner 2.00 gal 9” Paint Roller 10.00 pcs Baby Roller 5.00 pcs 2” Paint brush 10.00 pcs 1” Paint brush 5.00 pcs 8 Installation of Doors and Windows 1.00 lot Materials Doors and Windows 1.00 lot 9 Plumbing Works 1.00 lot Water Supply Pipes and Fittings 1 lot Labor 1 – Plumber 1.00 days 1 – Skilled Laborer 1.00 days Materials ½ PPR Gate Valve 1.00 pcs ½ x 90 PPR Elbow 4.00 pcs ½ PPR Tee 4.00 pcs ½ PPR Female Adapter 2.00 pcs ½ PPR Male Adapter 2.00 pcs ½ PPR End Cap 3.00 pcs ½ PPR 6.00 length ¾ Teflon Tape 4.00 roll Plumbing Fixtures and Fittings 1 lot Labor 1 – Plumber 6.00 days 1 – Skilled Laborer 6.00 days Materials Water Closet 4.00 sets Urinal 2.00 sets Counter Top Lavatory 4.00 sets Bathroom and Toilet Accessories 1 lot Labor 1 – Plumber 2.00 days 1 – Skilled Laborer 2.00 days Materials 4” x 4” Stainless Floor Drain 2.00 pc. Lavatory Faucet 4.00 pcs. Installation of Soil, Waste, Drain and Vent Pipes 1 lot Labor 1 – Plumber 3.00 days 1 – Skilled Laborer 3.00 days Materials 2” x 90 PVC Elbow 4.00 pcs 2” PVC Tee 2.00 pcs 2” PVC Pipe 2.00 length 2” x 45 PVC Elbow 4.00 pcs 3” x 90 PVC Elbow 4.00 pcs 3” x 2” PVC Wye 4.00 pcs 3” PVC Wye 2.00 pcs 3” PVC Cleanout with Plug 2.00 pcs 3” PVC Pipe 6.00 length 10 Electrical Works 1.00 lot Labor 2 – Electrician 6.00 days 2 – Skilled Laborer 6.00 days Materials 12w Circular Downlight 20.00 pcs 1-Gang Switch 10.00 pcs 2-Gang Switch 10.00 pcs 3-Gang Switch 4.00 pcs 3-Way Switch 4.00 pcs ACU Outlet 3-Prong 2.00 pcs Junction Box 30.00 pcs Utility Box 30.00 pcs 10 AWG or 5.5mm2 THHn Cu. Wire 5.00 box 12 AWG or 3.5mm2 THHn Cu. Wire 5.00 box Big Electrical Tape 5.00 pcs 15mmØ or ½” PVC Pipe PNS-14 115.00 pcs 15mmØ or ½” PVC Electrical Elbow 65.00 pcs 11 Tile Works 121.00 m2 Labor 2 – Tile Setter 12.00 days 2 – Skilled Laborer 12.00 days Materials 24” x 12” Wall Tiles 200.00 pcs 24” x 24” Floor Tiles 60.00 pcs Fine Sand 8.00 m3 40kg Portland Cement 20.00 bags Tile Adhesive heavy duty 30.00 bags Tile Grout 5.00 packs Super thin cut tile cutting disc 50.00 pcs 12 Carpentry 40.00 m2 Labor 4 – Carpenter 20.00 days 2 – Skilled Laborer 20.00 days Materials Wall Angle, 0.60mm x 25mm x 25mm x 3000mm 50.00 pcs Furring Channel, Double 0.40mm x 19mm x 50mm x 3000mm 300.00 pcs 3.5.052 Carrying Channel, 1.00mm x 12mm x 38mm x 3000mm 100.00 pcs Marine Plywood ¼” x 1200mm x 2440mm 50.00 pcs Marine Plywood ½” x 1200mm x 2440mm 50.00 pcs PVC Panel ceiling 60.00 pcs PVC Panel wall 80.00 pcs W-clip 500.00 pcs 1/8 x ½ Blind Rivets 2000.00 pcs Pre-bid Conference: Date: 06/05/2026 Time: 2:00 PM Venue: Conference Room, 2/F, Multi-Purpose Building, Poblacion, Malay, Aklan Approved Budget: 5,500,000.00 Closing Date: 15/05/2026
Company Industry: Municipal Corporations

Key values

Tender Estimated cost : PHP 5,500,000
Closing date : 15/05/2026
Location : Philippines - Not Classified

Tender Documents

Top