|
Tender description :
|
Rfq – Request for Quotation for Repairing A Transformer : Scope Of Work: The Transformers (1 Bloemhof And 2 Christiana) Are Currently Experiencing An Oil Leak. Transformer Oil Is Critical For Insulation And Cooling. Continued Leakage May Lead To Overheating, Insulation Failure, And Total Transformer Breakdown. Immediate Corrective Action Is Required To Prevent Plant Failure And Safety Hazards. Corrective Actions: - 1. Repair Damaged Gaskets Or Seals 2. Repair Radiator Or Tank Leaks 3. Tighten Loose Bolts And Fittings 4. Pressure Test For Leak Confirmation Mandatory Requirements:
CLOSING DATE: 4 MAY 2026
|