|
Tender description :
|
Advance notice or periodic indicative notice used for Emission Reduction Maintenance Dredging Work in Rotterdam
Description :? To make dredging operations more sustainable, HbR and RWS intend to jointly tender Lot 3 as a frontrunner project. The ambitions for this lot focus on emission reduction in dredging operations, with CO2 eq., NOx, and PM10 (greenhouse gases, nitrogen oxides, and particulate matter, respectively) designated as key areas of focus, in accordance with the SEB covenant. Currently, no medium-sized trailing suction hopper dredger is available capable of operating continuously on Renewable Fuels of Non-Biological Origin (RFNBOs) or Renewable Electricity (RE). The frontrunner project aims to stimulate the development of such equipment and deploy it within a multi-year contract, with a significant application of RFNBO/RE.
to Make the Dredging Work More Sustainable, Por and Rws Want to Jointly Request Plot 3 as a Frontrunner Project. the Ambitions for This Plot Focus on Emission Reduction During Dredging Work, with Co2 Eq., Nox and Pm10 (greenhouse Gases, Nitrogen Oxides and Particulate Matter Respectively) as Important Areas of Attention, in Accordance with the Seb Agreement. There is Currently No Medium-sized Trailing Suction Hopper Dredger Available That Can Operate Continuously on Renewable Fuels of Non-biological Origin (rfnbos) Or Renewable Electricity (re). the Aim of the Pioneering Project is to Stimulate the Development of Such Equipment and to Deploy It Within a Multi-year Contract, with a Significant Application of Rfnbo/h.e.
|