Requirement :
|
The scope of work includes design, engineering, manufacturing, assembly, supply, inspection and testing at works and at site, if required, of CNG Mobile / stationary Storage Cascade of 4500 WL (Type 1) capacity at 15°C, for filling and storing of CNG at 255 Kg/cm2 at 20 to 48°C. The cascades for the project shall be completed in all respects on Annual Rate contract (ARC) basis. The rate of ARC shall be valid for a period of 12 months from the date of issuance of FOA. 21 NOS STATIC CASCADES (4500WL), 10 NOS MOBILE CASCADES (4500 WL)
|