Tender Detail
| Buyer/Seller : | Can be viewed by Subscribers |
|---|---|
| DID : | 96965060 |
| Requirement : |
Amc for Various Maintenance Activities to Be Carried Out Under Planned and Emergency Outage Through Pl Outsourced Agency at 220kv Kalwa & 400kv Kalwa Under 400kv R S O&m Dn Kalwa for the F.y.2026-27. Repl. Single Terminal Clamp Replacement of Terminal Clamp with New One at Equipment Terminal Withremoval of Jumper From Both Ends with Crimping and Refitting for Single in Planned Outage. , Pl_repl. Twin Terminal Clamp Replacement of Terminal Clamp with New One at Equipment Terminal Withremoval of Jumper From Both Ends with Crimping and Refitting for Twin in Planned Outage. , Pl_termination 19cx2.5mm² Cable Both End Cable Termination of 19c X 2.5 Mm² at Both Ends as Per Termination Schedule Provided with Cable Glanding at Both Ends Panels/ Mb Etc. with Drilling of Suitable Size Holes for Cable Glands as Per Cable Sizes with Spare Holes as Directed, Glanding the Cable with Proper Size Glands to Make It Tight and Firm, Checking the Cable Cores From Both Side for Continuity with Suitable Arrangement and Providing the Cross Feruling as Per Cable Schedule to Both Ends of Cable and Crimping of Suitable Size Required Lugs as Per Cable Core Size with Suitable Crimping Tool Making It Tight Connection and Then Dressing Up the Same in Tbs Provided in Panels / Mb Etc. as Directed for the Following Cable with Sealing of Spare Holes ... By Providing Reqd Size Lugs , Glands and Ferules in Planned Outage , Pl_dismantling 220kv Sus. Wt Wt Si Dismantling of 220 Kv Wave Trap Suspension Type with Removal of Jumper From Both Side, Suspension Hardware Along with Insulator String, Removal of Plate of Connection If Reqd to Beam Etc. in Planned Outage. , Pl_laying of 4cx2.5mm² Cable Laying of 4 Core 2.5mm² Control / Power Cables on Existing Cable Trays in Cable Trenches with Aluminum Tags at Both Ends with Binding the Same on Cable Trays at Suitable Intervals with Dressing, with Segregation of Control & Power Cables Separate on Cable Trays Rows as Directed, the Cables Will Be Provided By Msetcl in Drums , the Same Are Required to Be Transported to Required Place and Unwounded with Turntable Smoothly Avoiding the Damages to the Cables in Planned Outage. , Pl_repl. Qaud. Ten. Insulator String Replacement of Quad Tension Disc Insulator String with Removal of Hardware Connected, Jumpers Connected and Its Re-erection with New Insulators and Making the Connection of All Earlier Jumpers Etc. in Planned Outage. , Pl_dismantling 4"ips Tube Wt Labour T&p Dismentling of 4 Ips Tube Including Supply of All Labour T&p Etc Complete in Planned Outage. , Pl_dismantling 4cx2.5mm² Cable Dismantling of 4 Core 2.5mm² Control / Power Cables on Existing Cable Trays in Cable Trenches. Coiling and Stacking of Dismantled Cable at Site Store as Directed with Removal of Terminations at Both Ends with Removal of Glands Etc. in Planned Outage. , Pl_crimping of 132/220kv Repair Sleeves Crimping on 132/220kv Conductor for Repair Sleeves (overhead) with Suitable Size Capacity Crimping Machine with Suitable Size Dies in Planned Outage., Pl_erection of 88-120kv La Erection of 88-120 Kv Lightning Arrester in Planned Outage. , Pl_termination 12cx2.5mm² Cable Both End Cable Termination of 12c X 2.5 Mm² at Both Ends as Per Termination Schedule Provided with Cable Glanding at Both Ends Panels/ Mb Etc. with Drilling of Suitable Size Holes for Cable Glands as Per Cable Sizes with Spare Holes as Directed, Glanding the Cable with Proper Size Glands to Make It Tight and Firm, Checking the Cable Cores From Both Side for Continuity with Suitable Arrangement and Providing the Cross Feruling as Per Cable Schedule to Both Ends of Cable and Crimping of Suitable Size Required Lugs as Per Cable Core Size with Suitable Crimping Tool Making It Tight Connection and Then Dressing Up the Same in Tbs Provided in Panels / Mb Etc. as Directed for the Following Cable with Sealing of Spare Holes ... By Providing Reqd Size Lugs , Glands and Ferules in Planned Outage , Mobil&demob. Gang/eqpt Mobilization/demobilization of Oil Filter Plant and Gang for Work , Pl_crimping on 400kv Condr Repair Sleeve Crimping Works on 400 Kv Conductor for Repair Sleeves ( Overhead ) with Suitable Size Capacity Crimping Machine with Suitable Size Dies in Planned Outage., Pl_crimping 132/220kv Condr. Jumper Cone Crimping Works for 132 Kv/ 220 Kv Conductor with Suitable Size Capacity Crimping Machine with Suitable Size Dies for Jumper Cone at Ground in Planned Outage., Cold Washing of 400kv Susp. Insu. String Cold Line Washing of Insulator-400kv Suspension Tower , Pl_remove&erection of 145kv Cb Pole Removal & Erection of 145 Kv Circuit Breaker Pole in Planned Outage. , Pl_crimping 400kv Condr. Jumper Cone Crimping Works for 400 Kv Conductor with Suitable Size Capacity Crimping Machine with Suitable Size Dies for Jumper Cone at Ground in Planned Outage., Repl. 245kv Bushing of T/f Replacement of 245 Kv Bushing of 220/22 Kv 50 Mva Transformer • Draining Ofoil.• Removal of Old Bushings of Cgl Make T/f-i (sr. No. 24596)• Removal of Turret.• Replacement of Leads.• Crimping of Ferrules with New Leads.• Brazing of Leads with New Trimble.• Design of Leads, Cylinder &other Arrangement.• Fixing of Insulating Cylinder Press Board so as to Provide Adequate Dielectric Strength After Removal of Old Ct Bushings.• Modification of Turrets & Pipe Line (if Required)• Re-errection Ofturrets.• Erection of Bushings.• Provide New Gaskets. , Repl. 220kv Stn Insulator String Replacement of 220 Kv Single Tension Insulator String (stn) with Removal of Hardware Connected, Jumpers Connected and Its Re-erection with New Insulators and Making the Connection of All Earlier Jumpers. , Pl_repl. Jumper Connect. Eqpt for Quad Replacement of Jumper Connection with Its Removal with Spacers From the Equipment Terminal with Removal of Connector and Its Re Erection with Provided Terminal Clamps at Both Ends for Quadruple Conductor Jumper in Planned Outage. , Pl_repl. Qaud. Susp. Insulator String Replacement of Quad Suspension Disc Insulator String with Removal of Hardware Connected, Jumpers Connected and Its Re-erection with New Insulators and Making the Connection of All Earlier Jumpers Etc. in Planned Outage. , Pl_repl. Ips Tube Both Ends & Re-conn. Replacement of Ips Tube From the Equipment Terminal in 400 Kv Switchyard with Removal of Terminal Connectors at Both Ends and Its Re-errection with Provided Terminal Connectors in Planned Outage. , Pl_dismantling 10cx2.5mm² Cable Dismantling of 10 Core 2.5mm² Control / Power Cables on Existing Cable Trays in Cable Trenches. Coiling and Stacking of Dismantled Cable at Site Store as Directed with Removal of Terminations at Both Ends with Removal of Glands Etc. in Planned Outage. , Pl_laying of 7cx2.5mm² Cable Laying of 7 Core 2.5mm² Control / Power Cables on Existing Cable Trays in Cable Trenches with Aluminum Tags at Both Ends with Binding the Same on Cable Trays at Suitable Intervals with Dressing, with Segregation of Control & Power Cables Separate on Cable Trays Rows as Directed, the Cables Will Be Provided By Msetcl in Drums , the Same Are Required to Be Transported to Required Place and Unwounded with Turntable Smoothly Avoiding the Damages to the Cables in Planned Outage. , Pl_dismantling 12cx2.5mm² Cable Dismantling of 12 Core 2.5mm² Control / Power Cables on Existing Cable Trays in Cable Trenches. Coiling and Stacking of Dismantled Cable at Site Store as Directed with Removal of Terminations at Both Ends with Removal of Glands Etc. in Planned Outage. , Pl_repl. Jumper Connect.-twin Stub Bus Replacement of Jumper Connection (removal and Refitting) with Spacers From Twin Stub Bus with Its Removal From Suspension Insulator String Hardware Etc. From Both Ends and Re-erection with Provided Tenninal Clamps at Both Ends in Planned Outage. , Pl_stringing Twin Conductor Span Stringing of Twin Conductor Span Per Phasewith Hoisting of Disc Insulator Along with Hardware, Crimping of Conductor in Dead End Cone with Suitable Size Crimping Machine and Dies with R |
| Tender description : | Pl_repl. Single Terminal Clamp Replacement of Terminal Clamp with New One at Equipment Terminal Withremoval of Jumper From Both Ends with Crimping and Refitting for Single in Planned Outage.#,pl_repl. Twin Terminal Clamp Replacement of Terminal Clamp with New One at Equipment Terminal Withremoval of Jumper From Both Ends with Crimping and Refitting for Twin in Planned Outage.#,pl_termination 19cx2.5mm² Cable Both End Cable Termination of 19c X 2.5 Mm² at Both Ends as Per Termination Schedule Provided with Cable Glanding at Both Ends Panels/ Mb Etc. with Drilling of Suitable Size Holes for Cable Glands as Per Cable Sizes with Spare Holes as Directed, Glanding the Cable with Proper Size Glands to Make It Tight and Firm, Checking the Cable Cores From Both Side for Continuity with Suitable Arrangement and Providing the Cross Feruling as Per Cable Schedule to Both Ends of Cable and Crimping of Suitable Size Required Lugs as Per Cable Core Size with Suitable Crimping Tool Making It Tight Connection and Then Dressing Up the Same in Tbs Provided in Panels / Mb Etc. as Directed for the Following Cable with Sealing of Spare Holes ... By Providing Reqd Size Lugs , Glands and Ferules in Planned Outage#,pl_dismantling 220kv Sus. Wt Wt Si Dismantling of 220 Kv Wave Trap Suspension Type with Removal of Jumper From Both Side, Suspension Hardware Along with Insulator String, Removal of Plate of Connection If Reqd to Beam Etc. in Planned Outage.#,pl_laying of 4cx2.5mm² Cable Laying of 4 Core 2.5mm² Control / Power Cables on Existing Cable Trays in Cable Trenches with Aluminum Tags at Both Ends with Binding the Same on Cable Trays at Suitable Intervals with Dressing, with Segregation of Control & Power Cables Separate on Cable Trays Rows as Directed, the Cables Will Be Provided By Msetcl in Drums , the Same Are Required to Be Transported to Required Place and Unwounded with Turntable Smoothly Avoiding the Damages to the Cables in Planned Outage.#,pl_repl. Qaud. Ten. Insulator String Replacement of Quad Tension Disc Insulator String with Removal of Hardware Connected, Jumpers Connected and Its Re-erection with New Insulators and Making the Connection of All Earlier Jumpers Etc. in Planned Outage.#,pl_dismantling 4"ips Tube Wt Labour T&p Dismentling of 4 Ips Tube Including Supply of All Labour T&p Etc Complete in Planned Outage.#,pl_dismantling 4cx2.5mm² Cable Dismantling of 4 Core 2.5mm² Control / Power Cables on Existing Cable Trays in Cable Trenches. Coiling and Stacking of Dismantled Cable at Site Store as Directed with Removal of Terminations at Both Ends with Removal of Glands Etc. in Planned Outage.#,pl_crimping of 132/220kv Repair Sleeves Crimping on 132/220kv Conductor for Repair Sleeves (overhead) with Suitable Size Capacity Crimping Machine with Suitable Size Dies in Planned Outage.,pl_erection of 88-120kv La Erection of 88-120 Kv Lightning Arrester in Planned Outage.#,pl_termination 12cx2.5mm² Cable Both End Cable Termination of 12c X 2.5 Mm² at Both Ends as Per Termination Schedule Provided with Cable Glanding at Both Ends Panels/ Mb Etc. with Drilling of Suitable Size Holes for Cable Glands as Per Cable Sizes with Spare Holes as Directed, Glanding the Cable with Proper Size Glands to Make It Tight and Firm, Checking the Cable Cores From Both Side for Continuity with Suitable Arrangement and Providing the Cross Feruling as Per Cable Schedule to Both Ends of Cable and Crimping of Suitable Size Required Lugs as Per Cable Core Size with Suitable Crimping Tool Making It Tight Connection and Then Dressing Up the Same in Tbs Provided in Panels / Mb Etc. as Directed for the Following Cable with Sealing of Spare Holes ... By Providing Reqd Size Lugs , Glands and Ferules in Planned Outage#,mobil&demob. Gang/eqpt Mobilization/demobilization of Oil Filter Plant and Gang for Work#,pl_crimping on 400kv Condr Repair Sleeve Crimping Works on 400 Kv Conductor for Repair Sleeves ( Overhead ) with Suitable Size Capacity Crimping Machine with Suitable Size Dies in Planned Outage.,pl_crimping 132/220kv Condr. Jumper Cone Crimping Works for 132 Kv/ 220 Kv Conductor with Suitable Size Capacity Crimping Machine with Suitable Size Dies for Jumper Cone at Ground in Planned Outage.,cold Washing of 400kv Susp. Insu. String Cold Line Washing of Insulator-400kv Suspension Tower#,pl_remove&erection of 145kv Cb Pole Removal & Erection of 145 Kv Circuit Breaker Pole in Planned Outage.#,pl_crimping 400kv Condr. Jumper Cone Crimping Works for 400 Kv Conductor with Suitable Size Capacity Crimping Machine with Suitable Size Dies for Jumper Cone at Ground in Planned Outage.,repl. 245kv Bushing of T/f Replacement of 245 Kv Bushing of 220/22 Kv 50 Mva Transformer • Draining Ofoil.• Removal of Old Bushings of Cgl Make T/f-i (sr. No. 24596)• Removal of Turret.• Replacement of Leads.• Crimping of Ferrules with New Leads.• Brazing of Leads with New Trimble.• Design of Leads, Cylinder &other Arrangement.• Fixing of Insulating Cylinder Press Board so as to Provide Adequate Dielectric Strength After Removal of Old Ct Bushings.• Modification of Turrets & Pipe Line (if Required)• Re-errection Ofturrets.• Erection of Bushings.• Provide New Gaskets.#,repl. 220kv Stn Insulator String Replacement of 220 Kv Single Tension Insulator String (stn) with Removal of Hardware Connected, Jumpers Connected and Its Re-erection with New Insulators and Making the Connection of All Earlier Jumpers.#,pl_repl. Jumper Connect. Eqpt for Quad Replacement of Jumper Connection with Its Removal with Spacers From the Equipment Terminal with Removal of Connector and Its Re Erection with Provided Terminal Clamps at Both Ends for Quadruple Conductor Jumper in Planned Outage.#,pl_repl. Qaud. Susp. Insulator String Replacement of Quad Suspension Disc Insulator String with Removal of Hardware Connected, Jumpers Connected and Its Re-erection with New Insulators and Making the Connection of All Earlier Jumpers Etc. in Planned Outage.#,pl_repl. Ips Tube Both Ends & Re-conn. Replacement of Ips Tube From the Equipment Terminal in 400 Kv Switchyard with Removal of Terminal Connectors at Both Ends and Its Re-errection with Provided Terminal Connectors in Planned Outage.#,pl_dismantling 10cx2.5mm² Cable Dismantling of 10 Core 2.5mm² Control / Power Cables on Existing Cable Trays in Cable Trenches. Coiling and Stacking of Dismantled Cable at Site Store as Directed with Removal of Terminations at Both Ends with Removal of Glands Etc. in Planned Outage.#,pl_laying of 7cx2.5mm² Cable Laying of 7 Core 2.5mm² Control / Power Cables on Existing Cable Trays in Cable Trenches with Aluminum Tags at Both Ends with Binding the Same on Cable Trays at Suitable Intervals with Dressing, with Segregation of Control & Power Cables Separate on Cable Trays Rows as Directed, the Cables Will Be Provided By Msetcl in Drums , the Same Are Required to Be Transported to Required Place and Unwounded with Turntable Smoothly Avoiding the Damages to the Cables in Planned Outage.#,pl_dismantling 12cx2.5mm² Cable Dismantling of 12 Core 2.5mm² Control / Power Cables on Existing Cable Trays in Cable Trenches. Coiling and Stacking of Dismantled Cable at Site Store as Directed with Removal of Terminations at Both Ends with Removal of Glands Etc. in Planned Outage.#,pl_repl. Jumper Connect.-twin Stub Bus Replacement of Jumper Connection (removal and Refitting) with Spacers From Twin Stub Bus with Its Removal From Suspension Insulator String Hardware Etc. From Both Ends and Re-erection with Provided Tenninal Clamps at Both Ends in Planned Outage.#,pl_stringing Twin Conductor Span Stringing of Twin Conductor Span Per Phasewith Hoisting of Disc Insulator Along with Hardware, Crimping of Conductor in Dead End Cone with Suitable Size Crimping Machine and Dies with Required Hardware and Fixing of of Spacers for 220 Kv/132 Kv/22 Kv in Planned Outage.,pl_crimping Quad Condr-mb Jump T-clamp Crimping Works on Quad. Conductor with Suitable Size Capacity Crimping Machine ( Overhead ) with Suitable Size Dies for Main Bus Jumpers T-clamps in Planned Outage.,pl_fixing Mb By Required Ms Frame Fixing of Mb By Providing the Required Ms Frame on Cable Trench Or at Other Suitable Place as Directed with Grouting of Anchor Bolts Etc. Complete with Earthing Connection Complete in Planned Outage.#,cold Line Cleaning-disc Insu.susp.string Cold Line Cleaning [manually] of Disc Insulator Suspension String#,pl_dismantling 100 to 132 Kv La Dismantling of 100 to 132 Kv Lightning Arrester From the Support Structure with Removal of Jumper From Terminal Connector, and Stacks with Stacking with Removal of Earthing Connection and La Counter Etc. Complete in Planned Outage.#,pl_repl. Spacer on Stub Quad Bus Replacement of Old Spacer and Fixing of New Provided Spacers on Stub Bus - Quad as Directed in Planned Outages#,pl_crimping Single Condr-mb Jump T-clamp Crimping Works on Single Condutor with Suitable Size Capacity Crimping Machine (overhead) with Suitable Size Dies for Main Bus Jumpers T-clamps in Planned Outage.,pl_stringing Single Conductor Span Stringing of Single Conductor Span Per Phase with Hoisting of Disc Insulator Along with Hardware , Crimping of Conductor in Dead End Cone with Suitable Size Crimping Machine and Dies with Required Hardware and Fixing of of Spacers for 220 Kv/132 Kv/22 Kv in Planned Outage.,pl_dismantling 420kv Cvt Dismantling of 420 Kv Cvt in Planned Outage.#,stacking of Materials By Manual Stacking of Ehv Class Material By Using Manual.#,pl_dismantling 145kv Ct Dismantling of 145 Kv Current Transformer From Support Structure with Removal of Terminal Connectors and Jumpers and Cabling Connection From the Terminal Box in Planned Outage.#,pl_repl. 22-220kv Twin Ten.insu.string Replacement of 22-220 Kv Twin Tension Disc Insulator String on Tower with Removal of Hardware Connected, Jumpers Connected and Its R E-erection with New Insulators and Making the Connection of All Earlier Jumpers Etc. in Planned Outage.#,pl_dismantling 14cx2.5mm² Cable Dismantling of 14 Core 2.5mm² Control / Power Cables on Existing Cable Trays in Cable Trenches. Coiling and Stacking of Dismantled Cable at Site Store as Directed with Removal of Terminations at Both Ends with Removal of Glands Etc. in Planned Outage.#,repl. 420kv Bushing of T/f Replacement of 420kv Bushing • Draining of Oil.• Removal of Old Bushings • Removal of Turret.• Replacement of Leads.• Crimping of Ferrules with New Leads.• Brazing of Leads with New Trimble.• Design of Leads, Cylinder & Other Arrangement.• Fixing of Insulating Cylinder Press Board so as to Provide Adequate Dielectric Strength After Removal of Old Ct Bushings.• Modification of Turrets & Pipe Line (if Required)• Re-errection of Turrets.• Erection of Bushings.• Provide New Gaskets.#,fixing Angular Clamp for 4" Ips Tube Angular Clmap for 4" Ips Tube on Main and Top#,substation Amc for Various Maint Work,pl_repl. Spacer on Stub Twin Bus Replacement of Old Spacer and Fixing of New Provided Spacers on Stub Bus - Twin as Directed in Planned Outage.#,pl_remove&erection of 420kv Cb Pole Removal & Erection of 420 Kv Circuit Breaker Pole in Planned Outage.#,pl_erection 400kv Susp. Wt Wt Si Erection of 400 Kv Suspension Type Wave Trap with Hoisting the Plate Required to Be Fixed to Beam, Hardware & Insulator String with Jumper Connection at Both the Ends in Planned Outage.#,pl_dismantling 7cx2.5mm² Cable Dismantling of Old/dummy 7 Core 2.5mm² Armoured Control Cable From Cable Trench. Coiling and Stacking of Dismantled Cable at Site Store as Directed with Removal of Terminations at Both Ends with Removal of Glands Etc. in Planned Outage.#,pl_fixing Ips Tube on Post Insulator Fixing of Ips Tube on Post Insulators (400kv Or 33kv Tertiory ) with Provided Clamp as Directed in Planned Outage.#,pl_repl. Jumper Connect. Eqpt for Twin Replacement of Jumper Connection with Its Removal with Spacers From the Equipment Terminal with Removal of Connector and Its Re Erection with Provided Terminal Clamps at Both Ends for Twin Conductor Jumper in Planned Outage.#,pl_crimping Twin Condr -mb Jump T Clamp Crimping Works on Twin Conductor with Suitable Size Capacity Crimping Machine (overhead) with Suitable Size Dyes for Main Bus Jumpers T-clamps for Twin in Planned Outage,pl_dismantling 2cx2.5mm² Cable Dismantling of 2 Core 2.5 Mm² Control / Power Cables on Existing Cable Trays in Cable Trenches. Coiling and Stacking of Dismantled Cable at Site Store as Directed with Removal of Terminations at Both Ends with Removal of Glands Etc. in Planned Outage.#,pl_termination 4cx2.5mm² Cable Both End Cable Termination of 4c X 2.5 Mm² at Both Ends as Per Termination Schedule Provided with Cable Glanding at Both Ends Panels/ Mb Etc. with Drilling of Suitable Size Holes for Cable Glands as Per Cable Sizes with Spare Holes as Directed, Glanding the Cable with Proper Size Glands to Make It Tight and Firm, Checking the Cable Cores From Both Side for Continuity with Suitable Arrangement and Providing the Cross Feruling as Per Cable Schedule to Both Ends of Cable and Crimping of Suitable Size Required Lugs as Per Cable Core Size with Suitable Crimping Tool Making It Tight Connection and Then Dressing Up the Same in Tbs Provided in Panels / Mb Etc. as Directed for the Following Cable with Sealing of Spare Holes ... By Providing Reqd Size Lugs , Glands and Ferules in Planned Outage.#,pl_erection 420kv Cvt Erection of 420 Kv Cvt Alongwith Wiring in Planned Outage.#,pl_erection 420kv Ct on S/str Modif. Erection of 420 Kv Current Transformer on Provided Support Structure with Necessary Modification with Connecting the Terminal Connectors and Jumpers on Both Sides with Required Connection with Available Cables to the Terminal Box in Planned Outage.#,pl_dismantling 400kv 2b Condr Span Dismantling of Twin Conductor Span Per Phase of 400 Kv Stub Bus/main Bus Level with Removal of Hardware & Disc Insulators From Both Ends with Removal of Jumpers, Spacers Etc. Complete in Planned Outage.,pl_repl. Jumper Connect.-twin Main Bus Replacement of Jumper Connection with Spacers From the Twin Main Bus From Isolators and Its Re-erection with Given Terminal Clamps at Both Ends in Planned Outage.#,pl_laying of 19cx2.5mm² Cable Laying of 19 Core 2.5mm² Control / Power Cables on Existing Cable Trays in Cable Trenches with Aluminum Tags at Both Ends with Binding the Same on Cable Trays at Suitable Intervals with Dressing, with Segregation of Control & Power Cables Separate on Cable Trays Rows as Directed, the Cables Will Be Provided By Msetcl in Drums , the Same Are Required to Be Transported to Required Place and Unwounded with Turntable Smoothly Avoiding the Damages to the Cables in Planned Outage.#,pl_erection 220kv Susp. Wt Wt Si Erection of 220 Kv Wave Trap Suspension Type with Hoisting the Plate Required to Be Fixed to Beam, Hardware & Insulator String with Jumper Connection at Both the Ends in Planned Outage.#,pl_dismantling 400kv Susp. Wt Wt Si Dismantling of 400 Kv Wave Trap Suspension Type with Removal of Jumper From Both Side, Suspension Hardware Along with Insulator String, Removal of Plate of Connection If Reqd to Beam Etc. in Planned Outage.#,pl_erection of 198kv La Erection of 198 Kv Lightning Arrester on Provided Support Structure with Minor Modification with Stacks, Insulator Base, with Leveling, Connecting Terminal Connector and Jumper Connection with Connecting the Counter, with Earthing Connection Etc. Complete in Planned Outage.#,pl_laying of 12cx2.5mm² Cable Laying of 12 Core 2.5mm² Control / Power Cables on Existing Cable Trays in Cable Trenches with Aluminum Tags at Both Ends with Binding the Same on Cable Trays at Suitable Intervals with Dressing, with Segregation of Control & Power Cables Separate on Cable Trays Rows as Directed, the Cables Will Be Provided By Msetcl in Drums , the Same Are Required to Be Transported to Required Place and Unwounded with Turntable Smoothly Avoiding the Damages to the Cables in Planned Outage.#,pl_erection of 145kv Ct Erection of 145 Kv Current Transformer on Provided Support Structure with Necessary Modification with Connecting the Terminal Connectors and Jumpers on Both Sides with Required Connection with Available Cables to the Terminal Box in Planned Outage.#,pl_repl. 132kv Stn Disc Insulator String Replacement of 132 Kv Single Tension Disc Insulator String with Removal of Hardware Connected, Jumpers Connected and Its Re-erection with New Insulators and Making the Connection of All Earlier Jumpers Etc.#,service of Unskilled Labour to Provide Services of Unskilled Labour for Attending Day to Day Works at This Office During Office Hours Only on Working Days.#,pl_dismantling 420kv Ct Dismantling of 420 Kv Current Transformer From Support Structure with Removal of Terminal Connectors and Jumpers and Cabling Connection From the Terminal Box in Planned Outage.#,pl_repl. Jumper Connect.-single Stub Bus Replacement of Jumper Connection (removal and Refitting) with Spacers From Single Stub Bus with Its Removal From Suspension Insulator String Hardware Etc. From Both Ends and Re-erection with Provided Tenninal Clamps at Both Ends in Planned Outage.#,pl_laying of 2cx2.5mm² Cable Laying of 2 Core 2.5mm² Control / Power Cables on Existing Cable Trays in Cable Trenches with Aluminum Tags at Both Ends with Binding the Same on Cable Trays at Suitable Intervals with Dressing, with Segregation of Control & Power Cables Separate on Cable Trays Rows as Directed, the Cables Will Be Provided By Msetcl in Drums , the Same Are Required to Be Transported to Required Place and Unwounded with Turntable Smoothly Avoiding the Damages to the Cables in Planned Outage.#,pl_dismantling 198kv La Dismantling of 198 Kv Lightning Arrester From the Support Structure with Removal of Jumper From Terminal Connector, and Stacks with Stacking with Removal of Earthing Connection and La Counter Etc. Complete in Planned Outage.#,pl_laying of 14cx2.5mm² Cable Laying of 14 Core 2.5mm² Control / Power Cables on Existing Cable Trays in Cable Trenches with Aluminum Tags at Both Ends with Binding the Same on Cable Trays at Suitable Intervals with Dressing, with Segregation of Control & Power Cables Separate on Cable Trays Rows as Directed, the Cables Will Be Provided By Msetcl in Drums , the Same Are Required to Be Transported to Required Place and Unwounded with Turntable Smoothly Avoiding the Damages to the Cables in Planned Outage.#,cold Line Cleaning=220kv Insu.c/p String Cold Line Cleaning [manually] of Upto 220 Kv Insulator Cut Point String.#,pl_erection of 390kv La Erection of 390 Kv Lightning Arrester on Provided Support Structure with Minor Modification with Stacks, Insulator Base, with Leveling, Connecting Terminal Connector and Jumper Connection with Connecting the Counter, with Earthing Connection Etc. Complete in Planned Outage.#,pl_laying of 10cx2.5mm² Cable Laying of 10 Core 2.5mm² Control / Power Cables on Existing Cable Trays in Cable Trenches with Aluminum Tags at Both Ends with Binding the Same on Cable Trays at Suitable Intervals with Dressing, with Segregation of Control & Power Cables Separate on Cable Trays Rows as Directed, the Cables Will Be Provided By Msetcl in Drums , the Same Are Required to Be Transported to Required Place and Unwounded with Turntable Smoothly Avoiding the Damages to the Cables in Planned Outage.#,cold Washing of 400kv Tens. Insu. String Cold Line Washing of Insulator String for 400kv Tension Tower.#,pl_dismantling 220kv 1b Condr Span Dismantling of Single Conductorspan Per Phaseof 220 Kv Stub Bus/main Bus Level with Removal of Hardware & Disc Insulators From Both Ends with Removal of Jumpers, Spacers Etc. Complete in Planned Outage.,pl_repl. 220kv Twin Susp.insu. String Replacement of 220 Kv Suspension Disc Insulator String with Removal of Hardware Connected, Jumpers Connected and Its Reerection with New Insulators and Making the Connection of All Earlier Jumpers Etc. in Planned Outage.#,pl_termination 2cx2.5mm² Cable Both End Cable Termination of 2c X 2.5 Mm² at Both Ends as Per Termination Schedule Provided with Cable Glanding at Both Ends Panels/ Mb Etc. with Drilling of Suitable Size Holes for Cable Glands as Per Cable Sizes with Spare Holes as Directed, Glanding the Cable with Proper Size Glands to Make It Tight and Firm, Checking the Cable Cores From Both Side for Continuity with Suitable Arrangement and Providing the Cross Feruling as Per Cable Schedule to Both Ends of Cable and Crimping of Suitable Size Required Lugs as Per Cable Core Size with Suitable Crimping Tool Making It Tight Connection and Then Dressing Up the Same in Tbs Provided in Panels / Mb Etc. as Directed for the Following Cable with Sealing of Spare Holes ... By Providing Reqd Size Lugs , Glands and Ferules in Planned Outage.#,pl_remove&erection of 245kv Cb Pole Removal & Erection of 245 Kv Circuit Breaker Pole in Planned Outage.#,pl_erection of 245kv Ct Erection of 245 Kv Current Transformer on Provided Support Structure with Necessary Modification with Connecting the Terminal Connectors and Jumpers on Both Sides with Required Connection with Available Cables to the Terminal Box in Planned Outage.#,pl_dismantling 19cx2.5mm² Cable Dismantling of 19 Core 2.5mm² Control / Power Cables on Existing Cable Trays in Cable Trenches. Coiling and Stacking of Dismantled Cable at Site Store as Directed with Removal of Terminations at Both Ends with Removal of Glands Etc. in Planned Outage.#,pl_dismantling 245kv Ct Dismantling of 245kv Current Transformer From Support Structure with Removal of Terminal Connectors and Jumpers and Cabling Connection From the Terminal Box in Planned Outage.#,repl. Nut Bolt Prov & Replacement of Old Nut Bolt By New Gi Nut Bolt & Washers of Req Uired Sizes.#,pl_termination 14cx2.5mm² Cable Both End Cable Termination of 14c X 2.5 Mm² at Both Ends as Per Termination Schedule Provided with Cable Glanding at Both Ends Panels/ Mb Etc. with Drilling of Suitable Size Holes for Cable Glands as Per Cable Sizes with Spare Holes as Directed, Glanding the Cable with Proper Size Glands to Make It Tight and Firm, Checking the Cable Cores From Both Side for Continuity with Suitable Arrangement and Providing the Cross Feruling as Per Cable Schedule to Both Ends of Cable and Crimping of Suitable Size Required Lugs as Per Cable Core Size with Suitable Crimping Tool Making It Tight Connection and Then Dressing Up the Same in Tbs Provided in Panels / Mb Etc. as Directed for the Following Cable with Sealing of Spare Holes ... By Providing Reqd Size Lugs , Glands and Ferules in Planned Outage#,pl_repl. Jumper Connect. Eqpt for Single Replacement of Jumper Connection with Its Removal with Spacers From the Equipment Terminal with Removal of Connector and Its Re-erection with Provided Terminal Clamps at Both Ends for Single Conductor Jumper in Planned Outages.#,pl_dismantling 390kv La Dismantling of 390 Kv Lightning Arrester From the Support Structure with Removal of Jumper From Terminal Connector, and Stacks with Stacking with Removal of Earthing Connection and La Counter Etc. Complete in Planned Outage.#,dismantling&erection of 145kv Bushing Dismantling of Hv Side R Phase Bushing of 25mva 132/11kv Transformer and Erection of New Bushing in Its Place# |
| Company Industry: | Power Plant |
Key values
| Document fees : | INR 590 |
|---|---|
| EMD : | INR 39,220 |
| Tender Estimated cost : | INR 3,921,996 |
| Closing date : | 17/06/2026 |
| Location : | India-Maharashtra |