Tender description :
|
Tenders Are Invited for Pv Systems 73-00751-2800-442 "* Dates for Carrying Out the Main Work on the Construction Site:
benefits Start September 22, 2026; End of Service March 5, 2027
* Individual Appointments:
during Construction, a 3-week Plan Must Be Updated Weekly.
* Description of Procurement:
*dates for Carrying Out the Main Service on the Construction Site:
benefits Start September 22, 2026; End of Service March 5, 2027
*description of Procurement:
photovoltaic System Approx. 132 Kwp / 294 Pieces, Monocrystalline, 450 Wp
including Substructure for Green and Kalzip Roofs
inverter:
1 Piece 3 Phases / 50 Kw Outdoors
1 Piece 3 Phases / 36 Kw Outdoors
1 Piece 3 Phases / 25 Kw Outdoors
extension Nshv:
1 Piece Panel with Two Circuit Breakers 4-pole 400 A
1 Piece Nh Exit Field
corresponding Adjustment of Raised Floor
protection Concept:
according to Vde-ar-n 4105:2026-03 with Higher-level Protective Relays on the Medium Voltage Side for New Pv Systems and Existing Chp Plants (installed Woodward Mra4 Protection Relay Must Be Implemented and Re-parameterized)
eza Controller
pav,e Monitoring
na Protection
integration of Tae From Swm
wiring:
900 M String Cabling 6 Mm²
laying System:
dc Routes in the Outdoor Area
selective Extensions to the Existing Laying System "
|