1. Sector:Power Plant Construction of Head Race Tunnel, Adits, Surge Shaft, Excavation of penstock of Tiuni-Plasu HEP (72 MW) on River Tons in District INR 131.76 Cr INR 1.31 Bn
80 Days to go
08-Jul-2024
DID : 70385064 India | Uttaranchal
2. Sector:Power Plant Excavation of Pond Ash Compaction, Customer Bid for Services - Transptation Unloading of Pond Ash, Customer Bid for Services - EXCV Stack Fill Soil Completion, Customer Bid for Services - Supply Mix Spread of Compact Bentonit, Customer Bid for Services - Construction of Retaining Wall of RR Masonry. Qty 5 INR 72.56 Cr INR 725.62 Mn
3 Days to go
22-Apr-2024
DID : 70997988 India | Madhya Pradesh
3. Sector:Stainless Steel Bid for - Excavation Transportation of Iron Ore ICWSubgrade ore from Dalli Mech Mine Phase 5 Qty 1 INR 25.90 Cr INR 259.05 Mn
6 Days to go
25-Apr-2024
DID : 71109185 India | Chhattisgarh
4. Sector:Railways Transport Services Augmentation of facilities at Lokmanya Tilak Terminus Balance work of Construction of shunting neck, sick siding and modification of existing maintenance siding yard , extension of pit lines maintenance siding number 6, 7, 8 & 9 etc. & diversion of water supply line, drainage , storm water lines" INR 9.31 Cr INR 93.19 Mn
6 Days to go
25-Apr-2024
DID : 71017523 India | Multi State
5. Sector:Power Plant Tender for Transportation of ash from ash dyke II for filling of low lying area in Kumurdu village including excavation, loading lifting. Unloading, filling work and construction of ramp inside Ash Dyke II of SGTPS , Birsinghpur Distt 4.56 Cr 45.69 Mn
3 Days to go
22-Apr-2024
DID : 70340108 India | Madhya Pradesh
6. Sector:Railways Transport Services SW I Yesvantpur Improvements to pit lines including Through rail renewal (Secondary) of existing 52kg/90R rails with 52kg/90 UTS for a length of 1.185km on pit line 1 and 2. SW II Yesvantpur Improvements to pit lines including Through rail renewal (Secondary) of existing 52kg/90R rails with 52kg/90 UTS for a length of 1.135km on pit line 3 and 4. Maintenance period is 6 months or one monsoon period whichever is later. INR 4.31 Cr INR 43.12 Mn
10 Days to go
29-Apr-2024
DID : 70984767 India | Karnataka
7. Sector:Power Plant Civil Works for Construction of Foundation of 220kv/ 132kv Voltage X-mer, Soak Pit, Oil Tank Etc. at Various Substations Under Eht-construction Division 3.04 Cr 30.45 Mn
5 Days to go
24-Apr-2024
DID : 69097036 India | Madhya Pradesh
8. Sector:Power Plant Civil works for construction of 220kV voltage X-mer, 132kV voltage X-mer, soak pit and oil tank etc. at various substations in Ujjain Region under EHT-Construction Division . 2.52 Cr 25.26 Mn
5 Days to go
24-Apr-2024
DID : 69098697 India | Madhya Pradesh
9. Sector:Power Plant Civil works for construction of foundation of 220kv/ 132kv voltage x-mer, soak pit, oil tank etc. at various substations under eht - construction division. 2.40 Cr 24.04 Mn
5 Days to go
24-Apr-2024
DID : 69132706 India | Madhya Pradesh
10. Sector:Minerals Excavation stripping in Manganiferous Rock at minus 270 ft Level at Chikla B section minus 470 ft Level of Chikla Main section at Chikla Mine Quantity 15000 cmt
Qty 1
INR 2.39 Cr INR 23.97 Mn
216 Days ago
16-Sep-2023
DID : 64345499 India | Maharashtra